Lock the ladder, but write BusinessWorld's conditional version, not Tribune's date-certain one: 50 kW in 2027, then each lower rung only when printed readiness tests pass. Print the stranded-cost rule before the first rung, or remaining customers pay for switchers' exit.
grounding
legal_basis: [
{
"source_id": "ra-9136-s1-2",
"claim": "RA 9136 Sections 1-2 declare affordable electricity, free and fair competition, and protection of the public interest as it is affected by rates."
},
{
"source_id": "erc-roadmap-tribune",
"claim": "Tribune printed the draft roadmap steps, the October 30 comment deadline, the November 5-6 consultations, the P56.01 billion and P77.06 billion hypothetical gross exposure figures, and the proposed contract transition plans and pass-through safeguards."
},
{
"source_id": "news-bworld-erc-roadmap",
"claim": "BusinessWorld printed ERC Chairman Francis Saturnino C. Juan's 50 kW-in-2027 target, the 2028 hold at 50 kW, the conditional 30 kW step, the 2031 smart-meter-gated removal, the IEMOP centralized metering data hub, and the 2,692 switched customers with 311 aggregation groups."
},
{
"source_id": "budget-erc-roadmap-no-invent",
"claim": "The stranded-contract pesos are Tribune-only hypothetical gross exposure before mitigation; no metering appropriation is printed."
},
{
"source_id": "constraint-erc-roadmap-draft",
"claim": "This is a draft roadmap; the official notice PDF and case number are unprinted and no resolution number exists to cite."
}
]
burden: {
"who_pays": "Metering capital and the data hub first; no peso for either is published. Unmitigated stranded-contract exposure - hypothetically P56.01 billion at 50 kW and P77.06 billion at full opening per Tribune - would otherwise land on the distribution utilities' remaining customers.",
"who_administers": "The ERC writes the Resolution; distribution utilities submit smart-meter rollout plans and roll the meters; accredited third parties compete in metering from 2028; IEMOP hosts the centralized metering data hub.",
"who_is_harmed_if_wrong": "Households and small users left on default supply if stranded costs are passed to them while switchers exit, and small contestable customers who gain a paper right to choose with no compliant meter behind it."
}
prediction: {
"claim": "The ERC issues the Resolution keeping 50 kW for 2027 and printing readiness conditions for the 30 kW and threshold-free steps, plus a rule against automatic pass-through of stranded contract costs to remaining customers.",
"horizon": "issuance of the Resolution after the November consultations",
"metric": "the published Resolution's trigger clauses for the 2030-2031 steps and its stranded-cost pass-through rule"
}
cost_estimate: {
"narrative": "No peso is published for the metering program or the data hub. The only printed pesos are the ERC's hypothetical annual gross stranded-contract exposure, P56.01 billion at the 50 kW step and P77.06 billion at full retail competition, which Tribune printed as before-mitigation figures rather than projected losses. The cost structure: smart meters and the IEMOP registry are capital costs that must land ahead of each rung, and stranded-contract mitigation is an allocation question the Resolution must settle before the first rung."
}
confidence: 0.55
prior_art: []
prior_art_verification: pending_verification